22 August 1961 · Driving through

The lorry with an unloading permit that did not stop

At about 11.50 a.m. on 22 August 1961 an old private lorry with a permit to unload at the Zimmerstraße/Wilhelmstraße control point was let through, did not stop, and drove on into West Berlin.

Black-and-white photo of a graffiti-covered wall running along a street, a pedestrian and cyclists on the western side, and behind the wall a second wall, a watchtower and East Berlin buildings.
The Wall along Zimmerstraße seen from the West Berlin viewing platform at the corner of Wilhelmstraße in 1988; control point 38 stood at this corner in 1961 Photo: Fortepan / Urbán Tamás. Wikimedia Commons, CC BY-SA 3.0

At about 11.50 a.m. on 22 August 1961 a lorry that held an unloading permit passed control point 38 at the corner of Zimmerstraße and Wilhelmstraße. According to the East Berlin police journal, it did not stop to unload but drove off towards West Berlin. The police described it as a privately owned lorry of an older make; type and number plate were unknown.

The Stasi report of the same day said the lorry, which had been let through the control point because of its unloading permit, had forcibly crossed the border.

Sources

Facts checked against the sources: September 2026

Spotted an error, or know more about this story? Email us a correction or addition

Cite this page

Berlin Experiences, “The lorry with an unloading permit that did not stop”, Berlin Wall Escapes, 2026, https://berlinwallescapes.com/escapes/zimmer-wilhelmstrasse-unloading-permit-lorry-1961/ (accessed [date]).

  1. 16 August 1961

    The flower-box lorry at Köpenicker Straße

    At 6.30 on 16 August 1961 a driver loaded flower boxes in front of a florist's in Köpenicker Straße and drove back and forth, faking delivery trips. Then he drove straight over the crossing into West Berlin.

    Driving through · Reached the West · Mitte

  2. 17 August 1961

    A tipper lorry from the building site drives through the Sonnenallee crossing

    At about 7.15 p.m. on 17 August 1961 a tipper lorry coming from the building site on the Heidekampweg drove through the Sonnenallee control point into West Berlin.

    Driving through · Reached the West · Treptow-Köpenick (Baumschulenweg) → Neukölln

  3. 20 August 1961

    A militia man deserts from the wire detail at Zimmerstraße

    On the morning of 20 August 1961 a member of a workers' militia unit, a DBD party official, left the wire detail he was working with at the corner of Zimmerstraße and Wilhelmstraße and went over to West Berlin without his weapon.

    Guards who fled · Reached the West · Mitte → Friedrichshain-Kreuzberg

  4. 23 August 1961

    Over the wall from Zimmerstraße 85

    At about 9.55 p.m. on 23 August 1961 a person came out of the house at Zimmerstraße 85 and got over the wall into West Berlin before the guard could stop them.

    Over the wall · Reached the West · Mitte → Friedrichshain-Kreuzberg