23 August 1961 · By train · Staaken

An engine driver uses the night shunting at Staaken station

At 2.30 a.m. on 23 August 1961 an engine driver from Wustermark took advantage of shunting work at Staaken station, then on the GDR side of the border, and crossed into West Berlin.

Colour photo: a diesel locomotive pulls a long train of passenger coaches along tracks between two lines of white concrete wall; a watchtower stands on the left, tall lamp posts line the tracks and dry grass and weeds fill the foreground.
The Wall and a watchtower along the railway at Staaken in October 1986, seen from West Berlin as a transit train from Hamburg passes; in 1961 the GDR's Staaken station lay on this line just beyond the border Photo: Roehrensee. Wikimedia Commons, CC BY-SA 3.0

Ten days after the sector border was sealed, the Stasi's daily situation report of 24 August 1961 (No. 477/61) noted that breakthroughs were falling as the barriers were strengthened. Even so, it listed five cases on 23 August in which people got from the GDR into West Berlin across the outer ring.

The first was at the railway. At about 2.30 a.m. an engine driver from Wustermark broke through the border in the section of Staaken station, which then lay in Kreis Nauen on the GDR side of the line. The report says only that he made use of shunting operations to do it; it does not say whether he crossed on a locomotive or on foot between the moving trains.

The border fence around the station was new. West Berlin police had reported on the night of 20 to 21 August that FDJ members were putting up a second fence along Nennhauser Damm and Finkenkruger Weg in Staaken, and that nine layers of barbed wire already ran from the Brunsbütteler Damm to Staaken station.

Sources

  1. Jahrgang 1961: Lage nach dem Bau der Berliner Mauer (7) – Bericht Nr. 477/61, 24. August 1961Stasi-Unterlagen-Archiv (DDR im Blick)
  2. Chronik 1961, August (daily entries, incl. West Berlin police reports of 20/21 August on the Staaken fence)Chronik der Mauer

Spotted an error, or know more about this story? Email us a correction or addition

  1. 14 August 1961

    The works locomotive that stopped on the line

    On 14 August 1961 the driver of a works locomotive at VEB Bergmann-Borsig drove out of the plant towards Wilhelmsruh, stopped on the line and got away to West Berlin.

    By train · Reached the West · Pankow

  2. 19 August 1961

    A Konsum delivery van rolls through the wire at Staaken

    The guards knew the van – it delivered to the Volkshaus restaurant every day – so nobody stopped it until it sped up and drove over the new wire fence into West Berlin.

    Driving through · Reached the West · Spandau (Staaken)

  3. 5 December 1961

    The last train to freedom

    Locomotive driver Harry Deterling drove a passenger train at full speed through the terminus at Albrechtshof and across the border into West Berlin.

    By train · Reached the West · Spandau

  4. 8 September 1961

    A Barkas van smashes through the Brandenburg Gate

    At 2.50 in the morning a small Barkas van raced through the right-hand side of the Brandenburg Gate at about 70 km/h, broke through the metal bars and stopped on the western side.

    Driving through · Reached the West · Mitte