21 August 1961 · Over the wall

A fitter climbs the Bergmann-Borsig factory wall with a ladder

On 21 August 1961 a fitter born in 1942, who was helping to put up a wire fence along the wall of VEB Bergmann-Borsig in Wilhelmsruh, left his brigade on a pretext and climbed over the wall with a ladder into West Berlin.

Night view of a long brick industrial building with rows of windows, some boarded up, behind a construction fence.
A hall of the former Bergmann works (VEB Bergmann-Borsig) in Wilhelmsruh in 2022; in 1961 the works wall formed part of the border Photo: Ubahnverleih. Wikimedia Commons, CC0

On 21 August 1961, at about 10.15 a.m., Siegfried E., a fitter born in 1942 from Berlin-Blankenburg, was working with a brigade at VEB Bergmann-Borsig in Wilhelmsruh, putting up a wire fence along the works wall. According to the East Berlin police journal he left the brigade on a pretext and climbed over the wall with a ladder.

The Stasi recorded the escape in its report of 22 August: a fitter from Bergmann-Borsig had fled to West Berlin while his brigade was stringing wire along the wall.

Sources

Facts checked against the sources: September 2026

Spotted an error, or know more about this story? Email us a correction or addition

Cite this page

Berlin Experiences, “A fitter climbs the Bergmann-Borsig factory wall with a ladder”, Berlin Wall Escapes, 2026, https://berlinwallescapes.com/escapes/bergmann-borsig-siegfried-e-ladder-1961/ (accessed [date]).

  1. 22 August 1961

    Three surveyors near Wilhelmsruh station are collected by West Berlin customs

    According to a Stasi report of 22 August 1961, three employees of the surveying office who were doing survey work near Wilhelmsruh S-Bahn station fled to the West, where a West Berlin customs vehicle picked them up.

    Over the wall · Reached the West · Pankow (Wilhelmsruh) → Reinickendorf

  2. 20 August 1961

    A shot is fired at a man with a rucksack crossing the tracks near Wilhelmsruh

    At 7.50 p.m. on 20 August 1961 a man with a rucksack broke through over the railway line about 300 m from Wilhelmsruh station into West Berlin; an aimed carbine shot was fired at him.

    Over the wall · Reached the West · Pankow (Wilhelmsruh) → Reinickendorf

  3. 22 August 1961

    A brewery tractor driver leaves the border works at Chausseestraße

    On 22 August 1961 the driver of a tractor from the Schultheiss brewery, used for building the border fortifications at Chausseestraße, fled to West Berlin.

    Over the wall · Reached the West · Mitte

  4. 23 August 1961

    Two volunteer firemen from Groß Kreuz leave the border works at Kleinmachnow

    Two members of the Groß Kreuz volunteer fire brigade, who had signed up to help build the border fortifications, went over to West Berlin near the Kleinmachnow/Ost control point on the morning of 23 August 1961.

    Over the wall · Reached the West · Kleinmachnow → Steglitz-Zehlendorf